Our Projects
PEDESTRIAN NEW CORNICH BRIDGE
LOCATION: JEDDAH, KSA | USE : INFRA STRUCTURE | TRADE: STEEL STRUCTURE
Scope of Work: EB Management team's scope is to design, supply and install the longest steel structure pedestrian bridge in the middle east. The bridge is around 700 M in length ns weighs around 650 MT of steel structure while bridging three different main roads.
KING ABDULLAH HUMINITARIAN FOUNDATION
LOCATION: RIYADH, KSA | USE : COMMERCIAL AND RESIDENTIAL | TRADE: STEEL STRUCTURE
Scope of Work: EB Management team's scope is to detail, supply and install the hot rolled structure steel elements of both the convention center which was a challenging 11 pieces of 65 lm clear span truss system each weighs around 70 MT and the hotel sky lounge 3 stories restaurant at the last 3 floors of the
NEW CORNICH LANDSCAPE
LOCATION: JEDDAH, KSA | USE : INFRA STRUCTURE | TRADE: SOFT AND HARD SCAPE
Scope of Work: EB Management team's scope is to supply and install the interlock, curbstones, green areas, precast chairs and pins at the Nawras area location along with the steel structure handrails.
HOUSING BANK HEAD QUARTERS
LOCATION: AMMAN, JORDAN | USE : COMMERCIAL | TRADE: STEEL STRUCTURE
Scope of Work: The project is considered the biggest steel structure project in Jordan built from hot-rolled steel structure sections including a one of a kind 20 LM cantilever that supports three floors of offices above the free standing cantilever. The building is 7 floors with a total area of 76,000 m2 built to fit 1200 employees. the scope was to project manage the erection of the steel structure.
TARIFY'S RESIDENCE VILLA
LOCATION: JEDDAH, KSA | USE : RESIDENTIAL | TRADE: LANDSCAPE AND MEP ,FINISHING
Scope of Work:Elite Builders renovated the two story villa, front yard and back yards including, replacing all MEP 2nd and 3rd fix, finishing and fitout along with the soft and hard scape for both the front and back yards.
While the Automation division replaced all switches, sockets and lightings with smart automation and linked the whole villa to their
building management system.
RESIDENTIAL APARTMENT
LOCATION: AMMAN, JORDAN | USE : RESIDENTIAL | TRADE: FINISHING, MEP AND LANDSCAPE
Scope of Work: Elite Builders handled the MEP, finishing and fit out while the Automation division replaced all switches, sockets and lightings with
smart automation and linked the whole apartment to their building management system.
BIGBEAST MDL BEAST SOUNDSTORM FESTIVAL 2019
LOCATION: RIYADH, KSA | USE : COMMERCIAL | TRADE: STEEL STRUCTURE
Scope of Work: This guiness record beast is around 150-meter width, 48-meter height and 30 meters in width, all was designed and built out of scaffolds. EB management team managed to design, supply and install the stage, and to coordinate with all different trades e.g. LED screens, façade, lights and sound, noting that the project duration was only 14 working days for the skeleton and 45 days for the complete structure.
MDLBEAST SOUNDSTORM : FESTIVAL 2021
LOCATION: RIYADH, KSA | USE : COMMERCIAL AND INFRA STRUCTURE | TRADE: STEEL STRUCTURE
Scope of Work: EB Management scope included the construction of the festival infrastructure including the underground cable and drain trenches, the parameter steel gates, the staking of then underground stages containers along some other elements.
MDL BEAST SOUNDSTORM FESTIVAL 2022
LOCATION: RIYADH, KSA | USE : COMMERCIAL AND INFRA STRUCTURE | TRADE: STEEL STRUCTURE AND REINFORCED CONCRETE
Scope of Work: EB Management team handled the construction and installation of structural Reinforced Concrete (RC) raft and strip foundations works set to support the steel arched tent superstructure, covering an area of approximately 80.0m x 112.0m. It consists of a 600mm deep and 5750mm wide strip foundation around the perimeter of the structure and a 250mm thick RC slab on grade (SoG), internally of the perimeter foundation.
STEEL STRUCTURE LOGO
CLIENT: MDLB | OWNER REPRESNTATIVE: TAIT | CONSULTANT: ROBERT BIRD GROUP (RBG)
LOCATION: RIYADH, KSA | USE : COMMERCIAL AND INFRA STRUCTURE | TRADE: STEEL STRUCTURE | DURATION: NOVEMBER, 2025
Scope of Work: EB Team handled the fabrication, transportation, and installation of reinforced concrete foundation, steel structure and cladding for a 20m height logo around 10 MT in weight
Car Park Shades
supply and installation at Tadweer PM5 Project
CLIENT: MOHAMMED FARAHAT COMPANY (FMC)| CONSULTANT: COENGR CONSULTING ENGINEERING GROUP
LOCATION: 3rd industrial city, Khomra, Jeddah, KSA | USE : COMMERCIAL AND INFRA STRUCTURE | TRADE: STEEL STRUCTURE AND REINFORCED CONCRETE | DURATION: July, 2025
Scope of Work: EB team handled the excavation supply and installation of reinforced concrete footings, steel structure and fabric of 100+ carparking for Tadweer PM5 project.
THREE STORY STEEL STRUCTURE BUILDING IN RIYADH
LOCATION: RIYADH, KSA | USE : COMMERCIAL AND INFRA STRUCTURE | TRADE: STEEL STRUCTURE | DURATION: NOVEMBER, 2025
Scope of Work: EB team handled the fabrication, delivery and installation of steel structure, stairs, checkered plates, gratings, handrails and cladding of a 100 MT skeleton.
STEEL STRUCTURE TUNNEL AT NORTHERN RIYADH
LOCATION: RIYADH, KSA | USE : COMMERCIAL AND INFRA STRUCTURE | TRADE: STEEL STRUCTURE AND REINFORCED CONCRET |DURATION: NOVEMBER, 2025
Scope of Work: EB team handled the excavation supply and installation of reinforced concrete strip footings, steel structure and cladding of a 100 MT skeleton.
AL TADWEER PM5 IN JEDDAH
CLIENT: AL TADWEER AL AKHDAR INDUSTRIAL COMPANY | CONSULTANT: CONSULTING ENGINEERING GROUP (COENGR) | Main Contractor: MUHAMMAD ABD-AL-RAHMAN FARHAT (FMC)
LOCATION: Jeddah, KSA | USE : COMMERCIAL AND INFRA STRUCTURE | TRADE: STEEL STRUCTURE AND REINFORCED CONCRETE | DURATION: 10 Months
Scope of Work: EB team handled the complete supply, installation, and handover of all Substructure and Superstructure reinforced‑concrete works – Including shuttering, reinforcement, concrete pouring, curing, de‑shuttering, and all related activities – In full compliance with the approved drawings, project specifications, and the responsibility matrix.
DZRT FLAGSHIP
CLIENT: BADAEL PIF COMPANY | CONSULTANT: JONES LANG LASALLE (JLL) | Landlord: STARLINK - ATELIER LA VIE
LOCATION:
Jeddah, KSA
| USE : | TRADE: FINISHING, MEP AND LANDSCAPE | DURATION: 3 Months
Scope of Work: EB team design and complete fit‑out execution, furniture works, MEP, and delivery of a turnkey flagship store – executed to the Employer’s specifications and program, including all as‑built documentation and defect remedying obligations..